

845 MW Power Station
Combined Cycle Plant at Brazil.
3 x 1575 kVA, 6 KV “Black start” Generator Set System for the management and starting of 5 x 170 MW open cycle gas turbines (850 MW), whom system will be converted into combined cycle in the near future.
Advantage
- High reliability for starting.
- High inductive load support by restricting voltage and frequency drop.
- Control System for complex maneuvering.
- Reliable SCADA communication and signaling system.
- Redundancy among components in order to secure starting.
Energy solutions to industries and companies from different sectors
Contact us or request a quote